Solar plant: site data

Solar power plant in Zaytsevo, Yevpatoriiskyi Raion, Autonomous Republic of Crimea

Zaytsevo: 1,331 kWh per kWp a year, tilt 35° 5° west of south (PVGIS). 3.6% above the oblast median (1,284). #52 of 120 in the rayon, #121 of 1025 in the oblast.

Yevpatoriya, the rayon centre, is 53 km away. 34 m above sea level. 53 km away: Yevpatoriya, the nearest bigger centre, 1,338 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 124 km. 8.52 m between rows, pitch 12.44 m (latitude 45.5°).

Yield of 1 kWp
1,331kWh/year
Tilt
35°5° west of south
10 kW
13,305kWh/year
Row pitch
12.44m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Zaytsevo

The designer opens with this place’s coordinates, latitude 45.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 124 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan66Feb113Mar137Apr153May150Jun162Jul159Aug135Sep102Oct62Nov43Dec

July: 162 kWh/kWp, December: 43 — 3.8 times less.

March: 113 against 106 in the oblast, 6.6% more.

Zaytsevo: plants, kWh
kWpA yearJulyDecember
56,653810215
1013,3051,620430
1519,9582,430645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yevpatoriiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.