Voskhod: 1,258 kWh per kWp a year, tilt 35° facing south (PVGIS). 2.0% below the oblast median (1,284). #107 of 126 in the rayon, #905 of 1025 in the oblast.
Kurman, the rayon centre, is 7 km away. 42 m above sea level. 7 km away: Kurman, the nearest bigger centre, the same 1,262. Snow and wind from the nearest regional centre in the DBN — Херсон, 187 km. 8.50 m between rows, pitch 12.42 m (latitude 45.5°).
- Yield of 1 kWp
- 1,258kWh/year
- Tilt
- 35°facing south
- 10 kW
- 12,581kWh/year
- Row pitch
- 12.42m · GCR 0.39
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Voskhod
The designer opens with this place’s coordinates, latitude 45.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 187 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 155 kWh/kWp, December: 42 — 3.7 times less.
February: 58 against 64 in the oblast, 9.4% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,291 | 775 | 210 |
| 10 | 12,581 | 1,550 | 420 |
| 15 | 18,872 | 2,325 | 630 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Dokhodnoye3 km1,256 kWh/kWp
- Plodorodnoye3 km1,259 kWh/kWp
- Chapayevo3 km1,257 kWh/kWp
- Novosel’tsy4 km1,258 kWh/kWp
- Vidnoye4 km1,259 kWh/kWp
- Shcherbakovo5 km1,258 kWh/kWp
All places: Kurmanskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.