Solar plant: site data

Solar power plant in Schastlivoye, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea

Schastlivoye: 1,196 kWh per kWp a year, tilt 34° 8° east of south (PVGIS). 6.9% below the oblast median (1,284). #84 of 85 in the rayon, #1023 of 1025 in the oblast.

Bakhchysaray, the rayon centre, is 26 km away. 387 m above sea level. 11 km away: Yalta, the nearest bigger centre, 1,313 — 8.9% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 256 km. 7.85 m between rows, pitch 11.82 m (latitude 44.6°).

Yield of 1 kWp
1,196kWh/year
Tilt
34°8° east of south
10 kW
11,955kWh/year
Row pitch
11.82m · GCR 0.40
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Schastlivoye

The designer opens with this place’s coordinates, latitude 44.6° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 256 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan67Feb95Mar120Apr130May132Jun142Jul143Aug118Sep95Oct64Nov43Dec

August: 143 kWh/kWp, December: 43 — 3.3 times less.

May: 130 against 146 in the oblast, 11.0% less.

Schastlivoye: plants, kWh
kWpA yearAugustDecember
55,978715215
1011,9551,430430
1517,9332,145645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.