Solar plant: site data

Solar power plant in Ptashkino, Kerchenskyi Raion, Autonomous Republic of Crimea

Ptashkino: 1,309 kWh per kWp a year, tilt 35° 5° west of south (PVGIS). 2.0% above the oblast median (1,284). #33 of 71 in the rayon, #282 of 1025 in the oblast.

Kerch, the rayon centre, is 31 km away. 49 m above sea level. 31 km away: Kerch, the nearest bigger centre, the same 1,309. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 308 km. 8.33 m between rows, pitch 12.25 m (latitude 45.2°).

Yield of 1 kWp
1,309kWh/year
Tilt
35°5° west of south
10 kW
13,090kWh/year
Row pitch
12.25m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Ptashkino

The designer opens with this place’s coordinates, latitude 45.2° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 308 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan69Feb106Mar131Apr149May148Jun154Jul158Aug133Sep103Oct65Nov47Dec

August: 158 kWh/kWp, January: 47 — 3.4 times less.

February: 69 against 64 in the oblast, 7.8% more.

Ptashkino: plants, kWh
kWpA yearAugustJanuary
56,545790235
1013,0901,580470
1519,6352,370705

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kerchenskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.