Solar plant: site data
Solar power plant in Privol’noye, Simferopolskyi Raion, Autonomous Republic of Crimea
Privol’noye: 1,231 kWh per kWp a year, tilt 34° 6° east of south (PVGIS). 4.1% below the oblast median (1,284). #115 of 115 in the rayon, #1010 of 1025 in the oblast.
Simferopol, the rayon centre, is 25 km away. 545 m above sea level — above 500 m the DBN snow and wind are higher. 15 km away: Alushta, the nearest bigger centre, 1,288 — 4.4% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 244 km. 7.95 m between rows, pitch 11.92 m (latitude 44.8°).
- Yield of 1 kWp
- 1,231kWh/year
- Tilt
- 34°6° east of south
- 10 kW
- 12,310kWh/year
- Row pitch
- 11.92m · GCR 0.40
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Privol’noye
The designer opens with this place’s coordinates, latitude 44.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 244 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 149 kWh/kWp, December: 47 — 3.2 times less.
May: 133 against 146 in the oblast, 8.9% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,155 | 745 | 235 |
| 10 | 12,310 | 1,490 | 470 |
| 15 | 18,465 | 2,235 | 705 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Chaykovskoye4 km1,245 kWh/kWp
- Perevalne6 km1,248 kWh/kWp
- Lavanda7 km1,302 kWh/kWp
- Mramornoye7 km1,244 kWh/kWp
- Zarechnoye8 km1,251 kWh/kWp
- Luchyste8 km1,332 kWh/kWp
All places: Simferopolskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.