Solar plant: site data

Solar power plant in Priozyornoye, Kerchenskyi Raion, Autonomous Republic of Crimea

Priozyornoye: 1,305 kWh per kWp a year, tilt 35° 5° west of south (PVGIS). 1.6% above the oblast median (1,284). #39 of 71 in the rayon, #309 of 1025 in the oblast.

Kerch, the rayon centre, is 15 km away. 9 m above sea level. 15 km away: Kerch, the nearest bigger centre, the same 1,309. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 300 km. 8.38 m between rows, pitch 12.30 m (latitude 45.3°).

Yield of 1 kWp
1,305kWh/year
Tilt
35°5° west of south
10 kW
13,047kWh/year
Row pitch
12.30m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Priozyornoye

The designer opens with this place’s coordinates, latitude 45.3° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 300 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan68Feb106Mar130Apr148May148Jun155Jul158Aug132Sep102Oct62Nov45Dec

August: 158 kWh/kWp, December: 45 — 3.5 times less.

February: 68 against 64 in the oblast, 6.3% more.

Priozyornoye: plants, kWh
kWpA yearAugustDecember
56,524790225
1013,0471,580450
1519,5712,370675

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kerchenskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.