Solar plant: site data

Solar power plant in Oktyabr’skoye, Kurmanskyi Raion, Autonomous Republic of Crimea

Oktyabr’skoye: 1,269 kWh per kWp a year, tilt 35° facing south (PVGIS). 1.1% below the oblast median (1,284). #47 of 126 in the rayon, #739 of 1025 in the oblast.

Kurman, the rayon centre, is 32 km away. 49 m above sea level. 32 km away: Kurman, the nearest bigger centre, 1,262 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 151 km. 8.58 m between rows, pitch 12.50 m (latitude 45.7°).

Yield of 1 kWp
1,269kWh/year
Tilt
35°facing south
10 kW
12,693kWh/year
Row pitch
12.50m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Oktyabr’skoye

The designer opens with this place’s coordinates, latitude 45.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 151 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan59Feb107Mar130Apr145May141Jun154Jul155Aug131Sep99Oct61Nov42Dec

August: 155 kWh/kWp, December: 42 — 3.7 times less.

February: 59 against 64 in the oblast, 7.8% less.

Oktyabr’skoye: plants, kWh
kWpA yearAugustDecember
56,347775210
1012,6931,550420
1519,0402,325630

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kurmanskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.