Solar plant: site data
Solar power plant in Okhotnich'e, Yaltynskyi Raion, Autonomous Republic of Crimea
Okhotnich'e: 1,300 kWh per kWp a year, tilt 35° 2° east of south (PVGIS). 1.2% above the oblast median (1,284). #43 of 58 in the rayon, #353 of 1025 in the oblast.
Yalta, the rayon centre, is 9 km away. 1,160 m above sea level — above 500 m the DBN snow and wind are higher. 9 km away: Yalta, the nearest bigger centre, 1,313 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 266 km. 8.00 m between rows, pitch 11.92 m (latitude 44.5°).
- Yield of 1 kWp
- 1,300kWh/year
- Tilt
- 35°2° east of south
- 10 kW
- 12,998kWh/year
- Row pitch
- 11.92m · GCR 0.40
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Okhotnich'e
The designer opens with this place’s coordinates, latitude 44.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 266 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 156 kWh/kWp, December: 51 — 3.1 times less.
December: 51 against 45 in the oblast, 13.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,499 | 780 | 255 |
| 10 | 12,998 | 1,560 | 510 |
| 15 | 19,497 | 2,340 | 765 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Vysokogornoye2 km1,290 kWh/kWp
- Kuibyshevo4 km1,310 kWh/kWp
- Koreyiz5 km1,345 kWh/kWp
- Vynohradne5 km1,322 kWh/kWp
- Haspra5 km1,327 kWh/kWp
- Gornoye5 km1,303 kWh/kWp
All places: Yaltynskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.