Solar plant: site data

Solar power plant in Novovasilyevka, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea

Novovasilyevka: 1,323 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 3.0% above the oblast median (1,284). #33 of 85 in the rayon, #173 of 1025 in the oblast.

Bakhchysaray, the rayon centre, is 11 km away. 170 m above sea level. 11 km away: Bakhchysaray, the nearest bigger centre, the same 1,320. Snow and wind from the nearest regional centre in the DBN — Херсон, 223 km. 8.38 m between rows, pitch 12.25 m (latitude 44.8°).

Yield of 1 kWp
1,323kWh/year
Tilt
36°1° east of south
10 kW
13,228kWh/year
Row pitch
12.25m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novovasilyevka

The designer opens with this place’s coordinates, latitude 44.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 223 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

55Jan72Feb106Mar130Apr144May142Jun153Jul153Aug132Sep110Oct73Nov52Dec

July: 153 kWh/kWp, December: 52 — 2.9 times less.

January: 55 against 47 in the oblast, 17.0% more.

Novovasilyevka: plants, kWh
kWpA yearJulyDecember
56,614765260
1013,2281,530520
1519,8422,295780

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.