Solar plant: site data

Solar power plant in Novoaleksandrovka, Perekopskyi Raion, Autonomous Republic of Crimea

Novoaleksandrovka: 1,296 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 1.0% above the oblast median (1,284). #58 of 84 in the rayon, #386 of 1025 in the oblast.

Yany Kapu, the rayon centre, is 24 km away. 4 m above sea level. 24 km away: Yany Kapu, the nearest bigger centre, 1,318 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 142 km. 8.91 m between rows, pitch 12.78 m (latitude 45.9°).

Yield of 1 kWp
1,296kWh/year
Tilt
36°1° west of south
10 kW
12,961kWh/year
Row pitch
12.78m · GCR 0.37
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novoaleksandrovka

The designer opens with this place’s coordinates, latitude 45.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 142 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan62Feb110Mar131Apr149May146Jun157Jul158Aug134Sep99Oct59Nov43Dec

August: 158 kWh/kWp, December: 43 — 3.7 times less.

November: 59 against 63 in the oblast, 6.3% less.

Novoaleksandrovka: plants, kWh
kWpA yearAugustDecember
56,481790215
1012,9611,580430
1519,4422,370645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.