Solar plant: site data

Solar power plant in Novoaleksandrovka, Bilohirskyi Raion, Autonomous Republic of Crimea

Novoaleksandrovka: 1,273 kWh per kWp a year, tilt 35° 2° east of south (PVGIS). 0.9% below the oblast median (1,284). #28 of 139 in the rayon, #674 of 1025 in the oblast.

Bilohirsk, the rayon centre, is 29 km away. 142 m above sea level. 29 km away: Simferopol, the nearest bigger centre, 1,293 — 1.5% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 206 km. 8.34 m between rows, pitch 12.26 m (latitude 45.2°).

Yield of 1 kWp
1,273kWh/year
Tilt
35°2° east of south
10 kW
12,725kWh/year
Row pitch
12.26m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novoaleksandrovka

The designer opens with this place’s coordinates, latitude 45.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 206 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan61Feb103Mar129Apr143May141Jun151Jul154Aug129Sep101Oct67Nov47Dec

August: 154 kWh/kWp, January: 45 — 3.4 times less.

November: 67 against 63 in the oblast, 6.3% more.

Novoaleksandrovka: plants, kWh
kWpA yearAugustJanuary
56,363770225
1012,7251,540450
1519,0882,310675

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilohirskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.