Solar plant: site data
Solar power plant in Nauchnyi, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea
Nauchnyi: 1,280 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,284). #70 of 85 in the rayon, #564 of 1025 in the oblast.
Bakhchysaray, the rayon centre, is 13 km away. 547 m above sea level — above 500 m the DBN snow and wind are higher. 13 km away: Bakhchysaray, the nearest bigger centre, 1,320 — 3.0% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 239 km. 8.32 m between rows, pitch 12.19 m (latitude 44.7°).
- Yield of 1 kWp
- 1,280kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 12,800kWh/year
- Row pitch
- 12.19m · GCR 0.39
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Nauchnyi
The designer opens with this place’s coordinates, latitude 44.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 239 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 149 kWh/kWp, December: 50 — 3.0 times less.
November: 73 against 63 in the oblast, 15.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,400 | 745 | 250 |
| 10 | 12,800 | 1,490 | 500 |
| 15 | 19,200 | 2,235 | 750 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Prokhladnoye4 km1,291 kWh/kWp
- Verkhorechye4 km1,281 kWh/kWp
- Sinapnoye6 km1,287 kWh/kWp
- Kudrino6 km1,290 kWh/kWp
- Trudolyubovka7 km1,285 kWh/kWp
- Mashino8 km1,295 kWh/kWp
All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.