Solar plant: site data

Solar power plant in Nadezhdino, Perekopskyi Raion, Autonomous Republic of Crimea

Nadezhdino: 1,313 kWh per kWp a year, tilt 36° facing south (PVGIS). 2.2% above the oblast median (1,284). #28 of 84 in the rayon, #252 of 1025 in the oblast.

Yany Kapu, the rayon centre, is 18 km away. 6 m above sea level. 18 km away: Yany Kapu, the nearest bigger centre, the same 1,318. Snow and wind from the nearest regional centre in the DBN — Херсон, 126 km. 8.99 m between rows, pitch 12.86 m (latitude 46.0°).

Yield of 1 kWp
1,313kWh/year
Tilt
36°facing south
10 kW
13,127kWh/year
Row pitch
12.86m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Nadezhdino

The designer opens with this place’s coordinates, latitude 46.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 126 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

51Jan65Feb110Mar132Apr151May147Jun159Jul160Aug136Sep102Oct58Nov43Dec

August: 160 kWh/kWp, December: 43 — 3.7 times less.

January: 51 against 47 in the oblast, 8.5% more.

Nadezhdino: plants, kWh
kWpA yearAugustDecember
56,564800215
1013,1271,600430
1519,6912,400645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.