Solar plant: site data

Solar power plant in Mezhgorye, Bilohirskyi Raion, Autonomous Republic of Crimea

Mezhgorye: 1,243 kWh per kWp a year, tilt 36° 7° east of south (PVGIS). 3.2% below the oblast median (1,284). #109 of 139 in the rayon, #986 of 1025 in the oblast.

Bilohirsk, the rayon centre, is 18 km away. 380 m above sea level. 18 km away: Bilohirsk, the nearest bigger centre, 1,261 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 231 km. 8.45 m between rows, pitch 12.32 m (latitude 45.0°).

Yield of 1 kWp
1,243kWh/year
Tilt
36°7° east of south
10 kW
12,431kWh/year
Row pitch
12.32m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Mezhgorye

The designer opens with this place’s coordinates, latitude 45.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 231 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

52Jan67Feb96Mar122Apr133May135Jun146Jul148Aug124Sep100Oct69Nov51Dec

August: 148 kWh/kWp, December: 51 — 2.9 times less.

December: 51 against 45 in the oblast, 13.3% more.

Mezhgorye: plants, kWh
kWpA yearAugustDecember
56,216740255
1012,4311,480510
1518,6472,220765

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilohirskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.