Solar plant: site data

Solar power plant in Lushino, Yevpatoriiskyi Raion, Autonomous Republic of Crimea

Lushino: 1,281 kWh per kWp a year, tilt 35° facing south (PVGIS). Exactly the oblast median (1,284). #117 of 120 in the rayon, #556 of 1025 in the oblast.

Yevpatoriya, the rayon centre, is 28 km away. 99 m above sea level. 28 km away: Yevpatoriya, the nearest bigger centre, 1,338 — 4.3% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 154 km. 8.46 m between rows, pitch 12.38 m (latitude 45.4°).

Yield of 1 kWp
1,281kWh/year
Tilt
35°facing south
10 kW
12,808kWh/year
Row pitch
12.38m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Lushino

The designer opens with this place’s coordinates, latitude 45.4° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 154 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan61Feb108Mar132Apr145May142Jun153Jul153Aug132Sep102Oct64Nov43Dec

July: 153 kWh/kWp, December: 43 — 3.6 times less.

February: 61 against 64 in the oblast, 4.7% less.

Lushino: plants, kWh
kWpA yearJulyDecember
56,404765215
1012,8081,530430
1519,2122,295645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yevpatoriiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.