Solar plant: site data

Solar power plant in Leninskoye, Kerchenskyi Raion, Autonomous Republic of Crimea

Leninskoye: 1,302 kWh per kWp a year, tilt 35° 3° west of south (PVGIS). 1.4% above the oblast median (1,284). #41 of 71 in the rayon, #326 of 1025 in the oblast.

Kerch, the rayon centre, is 45 km away. 37 m above sea level. 45 km away: Kerch, the nearest bigger centre, the same 1,309. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 294 km. 8.37 m between rows, pitch 12.29 m (latitude 45.3°).

Yield of 1 kWp
1,302kWh/year
Tilt
35°3° west of south
10 kW
13,023kWh/year
Row pitch
12.29m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Leninskoye

The designer opens with this place’s coordinates, latitude 45.3° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 294 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan68Feb107Mar131Apr147May148Jun155Jul157Aug133Sep102Oct63Nov45Dec

August: 157 kWh/kWp, January: 45 — 3.5 times less.

February: 68 against 64 in the oblast, 6.3% more.

Leninskoye: plants, kWh
kWpA yearAugustJanuary
56,512785225
1013,0231,570450
1519,5352,355675

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kerchenskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.