Solar plant: site data

Solar power plant in Krymskoye, Yevpatoriiskyi Raion, Autonomous Republic of Crimea

Krymskoye: 1,306 kWh per kWp a year, tilt 35° facing south (PVGIS). 1.7% above the oblast median (1,284). #97 of 120 in the rayon, #299 of 1025 in the oblast.

Yevpatoriya, the rayon centre, is 34 km away. 69 m above sea level. 34 km away: Yevpatoriya, the nearest bigger centre, 1,338 — 2.4% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 186 km. 8.34 m between rows, pitch 12.26 m (latitude 45.2°).

Yield of 1 kWp
1,306kWh/year
Tilt
35°facing south
10 kW
13,058kWh/year
Row pitch
12.26m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Krymskoye

The designer opens with this place’s coordinates, latitude 45.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 186 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan63Feb108Mar132Apr147May145Jun155Jul156Aug133Sep104Oct67Nov46Dec

August: 156 kWh/kWp, December: 46 — 3.4 times less.

November: 67 against 63 in the oblast, 6.3% more.

Krymskoye: plants, kWh
kWpA yearAugustDecember
56,529780230
1013,0581,560460
1519,5872,340690

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yevpatoriiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.