Solar plant: site data

Solar power plant in Krasnodarka, Kurmanskyi Raion, Autonomous Republic of Crimea

Krasnodarka: 1,268 kWh per kWp a year, tilt 35° facing south (PVGIS). 1.3% below the oblast median (1,284). #54 of 126 in the rayon, #758 of 1025 in the oblast.

Kurman, the rayon centre, is 20 km away. 25 m above sea level. 20 km away: Kurman, the nearest bigger centre, the same 1,262. Snow and wind from the nearest regional centre in the DBN — Херсон, 162 km. 8.55 m between rows, pitch 12.47 m (latitude 45.6°).

Yield of 1 kWp
1,268kWh/year
Tilt
35°facing south
10 kW
12,676kWh/year
Row pitch
12.47m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Krasnodarka

The designer opens with this place’s coordinates, latitude 45.6° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 162 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan59Feb106Mar129Apr145May142Jun153Jul155Aug131Sep99Oct61Nov43Dec

August: 155 kWh/kWp, December: 43 — 3.6 times less.

February: 59 against 64 in the oblast, 7.8% less.

Krasnodarka: plants, kWh
kWpA yearAugustDecember
56,338775215
1012,6761,550430
1519,0142,325645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kurmanskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources