Izyumovka: 1,275 kWh per kWp a year, tilt 35° facing south (PVGIS). 0.7% below the oblast median (1,284). #58 of 113 in the rayon, #640 of 1025 in the oblast.
Feodosiya, the rayon centre, is 19 km away. 234 m above sea level. 19 km away: Feodosiya, the nearest bigger centre, the same 1,277. Snow and wind from the nearest regional centre in the DBN — Херсон, 264 km. 8.27 m between rows, pitch 12.19 m (latitude 45.0°).
- Yield of 1 kWp
- 1,275kWh/year
- Tilt
- 35°facing south
- 10 kW
- 12,753kWh/year
- Row pitch
- 12.19m · GCR 0.39
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Izyumovka
The designer opens with this place’s coordinates, latitude 45.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 264 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 153 kWh/kWp, December: 49 — 3.1 times less.
December: 49 against 45 in the oblast, 8.9% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,377 | 765 | 245 |
| 10 | 12,753 | 1,530 | 490 |
| 15 | 19,130 | 2,295 | 735 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Pervomayskoye3 km1,270 kWh/kWp
- Krinichki4 km1,271 kWh/kWp
- Staryi Krym4 km1,250 kWh/kWp
- Klyuchevoye6 km1,295 kWh/kWp
- Babenkovo6 km1,272 kWh/kWp
- Otvazhnoye6 km1,293 kWh/kWp
All places: Feodosiiskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed