Solar plant: site data
Solar power plant in Illinka, Perekopskyi Raion, Autonomous Republic of Crimea
Illinka: 1,308 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 1.9% above the oblast median (1,284). #37 of 84 in the rayon, #287 of 1025 in the oblast.
Yany Kapu, the rayon centre, is 15 km away. 9 m above sea level. 15 km away: Yany Kapu, the nearest bigger centre, 1,318 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 129 km. 8.88 m between rows, pitch 12.75 m (latitude 45.8°).
- Yield of 1 kWp
- 1,308kWh/year
- Tilt
- 36°2° west of south
- 10 kW
- 13,077kWh/year
- Row pitch
- 12.75m · GCR 0.38
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Illinka
The designer opens with this place’s coordinates, latitude 45.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 129 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 160 kWh/kWp, December: 43 — 3.7 times less.
November: 60 against 63 in the oblast, 4.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,539 | 800 | 215 |
| 10 | 13,077 | 1,600 | 430 |
| 15 | 19,616 | 2,400 | 645 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Vorontsovka3 km1,308 kWh/kWp
- Traktovoye4 km1,296 kWh/kWp
- Svatovo6 km1,302 kWh/kWp
- Pravda6 km1,291 kWh/kWp
- Matveyevka7 km1,283 kWh/kWp
- Kurgannoye7 km1,315 kWh/kWp
All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.