Solar plant: site data

Solar power plant in Illinka, Perekopskyi Raion, Autonomous Republic of Crimea

Illinka: 1,308 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 1.9% above the oblast median (1,284). #37 of 84 in the rayon, #287 of 1025 in the oblast.

Yany Kapu, the rayon centre, is 15 km away. 9 m above sea level. 15 km away: Yany Kapu, the nearest bigger centre, 1,318 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 129 km. 8.88 m between rows, pitch 12.75 m (latitude 45.8°).

Yield of 1 kWp
1,308kWh/year
Tilt
36°2° west of south
10 kW
13,077kWh/year
Row pitch
12.75m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Illinka

The designer opens with this place’s coordinates, latitude 45.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 129 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan63Feb111Mar133Apr150May146Jun160Jul159Aug135Sep101Oct60Nov43Dec

July: 160 kWh/kWp, December: 43 — 3.7 times less.

November: 60 against 63 in the oblast, 4.8% less.

Illinka: plants, kWh
kWpA yearJulyDecember
56,539800215
1013,0771,600430
1519,6162,400645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.