Solar power plant in Gromovo, Yevpatoriiskyi Raion, Autonomous Republic of Crimea

Gromovo: 1,348 kWh per kWp a year, tilt 36° 4° west of south (PVGIS). 5.0% above the oblast median (1,284). #19 of 120 in the rayon, #33 of 1025 in the oblast.

Yevpatoriya, the rayon centre, is 44 km away. 40 m above sea level. 44 km away: Yevpatoriya, the nearest bigger centre, 1,338 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 141 km. 8.65 m between rows, pitch 12.52 m (latitude 45.4°).

Yield of 1 kWp
1,348kWh/year
Tilt
36°4° west of south
10 kW
13,476kWh/year
Row pitch
12.52m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Gromovo

The designer opens with this place’s coordinates, latitude 45.4° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 141 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

52Jan68Feb114Mar137Apr154May152Jun164Jul159Aug136Sep104Oct63Nov44Dec

July: 164 kWh/kWp, December: 44 — 3.7 times less.

January: 52 against 47 in the oblast, 10.6% more.

Gromovo: plants, kWh
kWpA yearJulyDecember
56,738820220
1013,4761,640440
1520,2142,460660

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yevpatoriiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.