Solar plant: site data

Solar power plant in Glinka, Yevpatoriiskyi Raion, Autonomous Republic of Crimea

Glinka: 1,328 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 3.4% above the oblast median (1,284). #57 of 120 in the rayon, #140 of 1025 in the oblast.

Yevpatoriya, the rayon centre, is 16 km away. 16 m above sea level. 16 km away: Yevpatoriya, the nearest bigger centre, 1,338 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 167 km. 8.60 m between rows, pitch 12.47 m (latitude 45.3°).

Yield of 1 kWp
1,328kWh/year
Tilt
36°1° west of south
10 kW
13,275kWh/year
Row pitch
12.47m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Glinka

The designer opens with this place’s coordinates, latitude 45.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 167 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

51Jan67Feb111Mar135Apr149May146Jun156Jul156Aug134Sep106Oct68Nov47Dec

July: 156 kWh/kWp, December: 47 — 3.3 times less.

January: 51 against 47 in the oblast, 8.5% more.

Glinka: plants, kWh
kWpA yearJulyDecember
56,638780235
1013,2751,560470
1519,9132,340705

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yevpatoriiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.