Solar power plant in Bratskoye, Perekopskyi Raion, Autonomous Republic of Crimea

Bratskoye: 1,298 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 1.1% above the oblast median (1,284). #56 of 84 in the rayon, #369 of 1025 in the oblast.

Yany Kapu, the rayon centre, is 17 km away. 10 m above sea level. 17 km away: Yany Kapu, the nearest bigger centre, 1,318 — 1.5% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 135 km. 8.88 m between rows, pitch 12.75 m (latitude 45.8°).

Yield of 1 kWp
1,298kWh/year
Tilt
36°1° west of south
10 kW
12,981kWh/year
Row pitch
12.75m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Bratskoye

The designer opens with this place’s coordinates, latitude 45.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 135 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan62Feb110Mar132Apr149May145Jun158Jul158Aug134Sep100Oct60Nov43Dec

July: 158 kWh/kWp, December: 43 — 3.7 times less.

November: 60 against 63 in the oblast, 4.8% less.

Bratskoye: plants, kWh
kWpA yearJulyDecember
56,491790215
1012,9811,580430
1519,4722,370645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.