Solar plant: site data

Solar power plant in Belinskoye, Kerchenskyi Raion, Autonomous Republic of Crimea

Belinskoye: 1,302 kWh per kWp a year, tilt 35° 5° west of south (PVGIS). 1.4% above the oblast median (1,284). #43 of 71 in the rayon, #332 of 1025 in the oblast.

Kerch, the rayon centre, is 31 km away. 31 m above sea level. 31 km away: Kerch, the nearest bigger centre, 1,309 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 283 km. 8.43 m between rows, pitch 12.35 m (latitude 45.4°).

Yield of 1 kWp
1,302kWh/year
Tilt
35°5° west of south
10 kW
13,017kWh/year
Row pitch
12.35m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Belinskoye

The designer opens with this place’s coordinates, latitude 45.4° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 283 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan66Feb108Mar133Apr147May147Jun156Jul157Aug133Sep101Oct63Nov45Dec

August: 157 kWh/kWp, January: 45 — 3.5 times less.

January: 45 against 47 in the oblast, 4.3% less.

Belinskoye: plants, kWh
kWpA yearAugustJanuary
56,509785225
1013,0171,570450
1519,5262,355675

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kerchenskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.