Solar plant: site data
Solar power plant in Kuibyshevo, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea
Kuibyshevo: 1,294 kWh per kWp a year, tilt 35° 2° east of south (PVGIS). 0.8% above the oblast median (1,284). #54 of 85 in the rayon, #415 of 1025 in the oblast.
Bakhchysaray, the rayon centre, is 14 km away. 159 m above sea level. 14 km away: Bakhchysaray, the nearest bigger centre, 1,320 — 2.0% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 244 km. 8.08 m between rows, pitch 12.00 m (latitude 44.6°).
- Yield of 1 kWp
- 1,294kWh/year
- Tilt
- 35°2° east of south
- 10 kW
- 12,939kWh/year
- Row pitch
- 12.00m · GCR 0.40
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Kuibyshevo
The designer opens with this place’s coordinates, latitude 44.6° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 244 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 49 — 3.1 times less.
November: 72 against 63 in the oblast, 14.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,470 | 760 | 245 |
| 10 | 12,939 | 1,520 | 490 |
| 15 | 19,409 | 2,280 | 735 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Novoulyanovka2 km1,293 kWh/kWp
- Maloye Sadovoye3 km1,298 kWh/kWp
- Nizhnaya Golubinka3 km1,282 kWh/kWp
- Bol’shoye Sadovoye3 km1,278 kWh/kWp
- Golubinka5 km1,283 kWh/kWp
- Tankovoye6 km1,301 kWh/kWp
All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.