Solar plant: site data

Solar power plant in Trylisy, Kropyvnytskyi Raion, Kirovohrad Oblast

Trylisy: 1,159 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,157). #134 of 254 in the rayon, #290 of 708 in the oblast.

Kropyvnytskyi, the rayon centre, is 58 km away. 210 m above sea level. 12 km away: Oleksandrivka, the nearest bigger centre, 1,152 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 52 km. 11.23 m between rows, pitch 15.05 m (latitude 49.0°).

Yield of 1 kWp
1,159kWh/year
Tilt
37°1° east of south
10 kW
11,591kWh/year
Row pitch
15.05m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Trylisy

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 52 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan56Feb96Mar120Apr141May143Jun148Jul145Aug118Sep88Oct40Nov27Dec

July: 148 kWh/kWp, December: 27 — 5.5 times less.

January: 38 against 35 in the oblast, 8.6% more.

Trylisy: plants, kWh
kWpA yearJulyDecember
55,796740135
1011,5911,480270
1517,3872,220405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kropyvnytskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.