Solar plant: site data

Solar power plant in Nastyne, Kropyvnytskyi Raion, Kirovohrad Oblast

Nastyne: 1,169 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.0% above the oblast median (1,157). #52 of 254 in the rayon, #98 of 708 in the oblast.

Kropyvnytskyi, the rayon centre, is 58 km away. 207 m above sea level. 16 km away: Oleksandrivka, the nearest bigger centre, 1,152 — 1.5% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 56 km. 11.22 m between rows, pitch 15.04 m (latitude 49.0°).

Yield of 1 kWp
1,169kWh/year
Tilt
37°2° east of south
10 kW
11,687kWh/year
Row pitch
15.04m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Nastyne

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 56 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb97Mar120Apr141May143Jun148Jul145Aug118Sep88Oct40Nov30Dec

July: 148 kWh/kWp, December: 30 — 4.9 times less.

January: 41 against 35 in the oblast, 17.1% more.

Nastyne: plants, kWh
kWpA yearJulyDecember
55,844740150
1011,6871,480300
1517,5312,220450

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kropyvnytskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.