Solar plant: site data

Solar power plant in Tikhomel’, Shepetivskyi Raion, Khmelnytskyi Oblast

Tikhomel’: 1,083 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.6% below the oblast median (1,100). #252 of 307 in the rayon, #981 of 1109 in the oblast.

Shepetivka, the rayon centre, is 62 km away. 242 m above sea level. 12 km away: Bilohirya, the nearest bigger centre, the same 1,086. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 67 km. 11.77 m between rows, pitch 15.64 m (latitude 50.0°).

Yield of 1 kWp
1,083kWh/year
Tilt
36°1° east of south
10 kW
10,830kWh/year
Row pitch
15.64m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Tikhomel’

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 67 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan48Feb84Mar118Apr135May136Jun139Jul137Aug112Sep83Oct36Nov27Dec

July: 139 kWh/kWp, December: 27 — 5.1 times less.

January: 29 against 32 in the oblast, 9.4% less.

Tikhomel’: plants, kWh
kWpA yearJulyDecember
55,415695135
1010,8301,390270
1516,2452,085405

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.