Solar plant: site data
Solar power plant in Noryliv, Shepetivskyi Raion, Khmelnytskyi Oblast
Noryliv: 1,077 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.1% below the oblast median (1,100). #285 of 307 in the rayon, #1076 of 1109 in the oblast.
Shepetivka, the rayon centre, is 65 km away. 226 m above sea level. 15 km away: Bilohirya, the nearest bigger centre, 1,086 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 63 km. 11.75 m between rows, pitch 15.62 m (latitude 49.9°).
- Yield of 1 kWp
- 1,077kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 10,770kWh/year
- Row pitch
- 15.62m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Noryliv
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 63 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 139 kWh/kWp, January: 27 — 5.1 times less.
January: 27 against 32 in the oblast, 15.6% less.
| kWp | A year | July | January |
|---|---|---|---|
| 5 | 5,385 | 695 | 135 |
| 10 | 10,770 | 1,390 | 270 |
| 15 | 16,155 | 2,085 | 405 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Vorobiivka1 km1,077 kWh/kWp
- Yampil2 km1,080 kWh/kWp
- Pankivtsi2 km1,077 kWh/kWp
- Lepesivka3 km1,080 kWh/kWp
- Tikhomel’3 km1,083 kWh/kWp
- Viazovets5 km1,080 kWh/kWp
All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.