Solar plant: site data

Solar power plant in Okhrimivtsi, Khmelnytskyi Raion, Khmelnytskyi Oblast

Okhrimivtsi: 1,126 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.3% above the oblast median (1,100). #24 of 576 in the rayon, #171 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 41 km away. 331 m above sea level. 9 km away: Vinkivtsi, the nearest bigger centre, the same 1,127. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 40 km. 11.04 m between rows, pitch 14.91 m (latitude 49.1°).

Yield of 1 kWp
1,126kWh/year
Tilt
36°1° east of south
10 kW
11,255kWh/year
Row pitch
14.91m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Okhrimivtsi

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 40 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb89Mar119Apr137May140Jun142Jul140Aug115Sep86Oct39Nov32Dec

July: 142 kWh/kWp, December: 32 — 4.4 times less.

December: 32 against 29 in the oblast, 10.3% more.

Okhrimivtsi: plants, kWh
kWpA yearJulyDecember
55,628710160
1011,2551,420320
1516,8832,130480

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.