Solar plant: site data

Solar power plant in Petrashivka, Khmelnytskyi Raion, Khmelnytskyi Oblast

Petrashivka: 1,122 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.9% above the oblast median (1,100). #56 of 576 in the rayon, #226 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 39 km away. 278 m above sea level. 8 km away: Vinkivtsi, the nearest bigger centre, 1,127 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 38 km. 11.03 m between rows, pitch 14.90 m (latitude 49.1°).

Yield of 1 kWp
1,122kWh/year
Tilt
36°1° east of south
10 kW
11,215kWh/year
Row pitch
14.90m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Petrashivka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 38 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan52Feb89Mar119Apr136May139Jun141Jul140Aug115Sep86Oct39Nov31Dec

July: 141 kWh/kWp, December: 31 — 4.5 times less.

December: 31 against 29 in the oblast, 6.9% more.

Petrashivka: plants, kWh
kWpA yearJulyDecember
55,608705155
1011,2151,410310
1516,8232,115465

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.