Solar plant: site data

Solar power plant in Netishyn, Shepetivskyi Raion, Khmelnytskyi Oblast

Netishyn: 1,073 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 2.5% below the oblast median (1,100). #296 of 307 in the rayon, #1098 of 1109 in the oblast.

Shepetivka, the rayon centre, is 34 km away. 177 m above sea level. 34 km away: Shepetivka, the nearest bigger centre, 1,085 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 43 km. 12.68 m between rows, pitch 16.45 m (latitude 50.3°).

Yield of 1 kWp
1,073kWh/year
Tilt
38°2° east of south
10 kW
10,725kWh/year
Row pitch
16.45m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Netishyn

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 43 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb90Mar115Apr128May131Jun134Jul133Aug108Sep80Oct36Nov28Dec

July: 134 kWh/kWp, December: 28 — 4.8 times less.

January: 35 against 32 in the oblast, 9.4% more.

Netishyn: plants, kWh
kWpA yearJulyDecember
55,363670140
1010,7251,340280
1516,0882,010420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.