Solar plant: site data
Solar power plant in Kalinya, Kamianets-Podilskyi Raion, Khmelnytskyi Oblast
Kalinya: 1,140 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 3.6% above the oblast median (1,100). #53 of 226 in the rayon, #53 of 1109 in the oblast.
Kamyanets-Podilskyi, the rayon centre, is 10 km away. 283 m above sea level. 10 km away: Kamyanets-Podilskyi, the nearest bigger centre, 1,129 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 73 km. 10.97 m between rows, pitch 14.79 m (latitude 48.7°).
- Yield of 1 kWp
- 1,140kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,397kWh/year
- Row pitch
- 14.79m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Kalinya
The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 73 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 35 — 4.1 times less.
January: 39 against 32 in the oblast, 21.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,699 | 710 | 175 |
| 10 | 11,397 | 1,420 | 350 |
| 15 | 17,096 | 2,130 | 525 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Kulchiivtsi3 km1,140 kWh/kWp
- Furmanivka6 km1,142 kWh/kWp
- Slobidka-Kulchiievetska6 km1,134 kWh/kWp
- Kolubaivtsi6 km1,132 kWh/kWp
- Suprunkivtsi7 km1,141 kWh/kWp
- Muksha Kytaihorodska8 km1,130 kWh/kWp
All places: Kamianets-Podilskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.