Solar plant: site data
Solar power plant in Golokhvasty, Khmelnytskyi Raion, Khmelnytskyi Oblast
Golokhvasty: 1,082 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.6% below the oblast median (1,100). #506 of 576 in the rayon, #989 of 1109 in the oblast.
Khmelnytskyi, the rayon centre, is 56 km away. 285 m above sea level. 7 km away: Volochysk, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 46 km. 11.34 m between rows, pitch 15.21 m (latitude 49.5°).
- Yield of 1 kWp
- 1,082kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 10,824kWh/year
- Row pitch
- 15.21m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Golokhvasty
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 46 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 139 kWh/kWp, December: 28 — 5.0 times less.
February: 46 against 51 in the oblast, 9.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,412 | 695 | 140 |
| 10 | 10,824 | 1,390 | 280 |
| 15 | 16,236 | 2,085 | 420 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Poliany1 km1,081 kWh/kWp
- Orikhovets3 km1,085 kWh/kWp
- Nemirintsy4 km1,080 kWh/kWp
- Chernylivka4 km1,085 kWh/kWp
- Kopachivka5 km1,078 kWh/kWp
- Fedirky6 km1,080 kWh/kWp
All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.