Solar plant: site data

Solar power plant in Tverdomedove, Beryslavskyi Raion, Kherson Oblast

Tverdomedove: 1,215 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.1% below the oblast median (1,253). #101 of 151 in the rayon, #659 of 711 in the oblast.

Beryslav, the rayon centre, is 58 km away. 22 m above sea level. 33 km away: Bereznehuvate, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Херсон, 94 km. 9.78 m between rows, pitch 13.65 m (latitude 47.4°).

Yield of 1 kWp
1,215kWh/year
Tilt
36°3° east of south
10 kW
12,146kWh/year
Row pitch
13.65m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Tverdomedove

The designer opens with this place’s coordinates, latitude 47.4° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 94 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan55Feb102Mar123Apr141May143Jun153Jul152Aug126Sep97Oct50Nov34Dec

July: 153 kWh/kWp, December: 34 — 4.5 times less.

January: 40 against 44 in the oblast, 9.1% less.

Tverdomedove: plants, kWh
kWpA yearJulyDecember
56,073765170
1012,1461,530340
1518,2192,295510

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks