Solar plant: site data
Solar power plant in Bilousove, Beryslavskyi Raion, Kherson Oblast
Bilousove: 1,215 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.0% below the oblast median (1,253). #98 of 151 in the rayon, #654 of 711 in the oblast.
Beryslav, the rayon centre, is 56 km away. 11 m above sea level. 29 km away: Bereznehuvate, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Херсон, 89 km. 9.76 m between rows, pitch 13.63 m (latitude 47.3°).
- Yield of 1 kWp
- 1,215kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 12,149kWh/year
- Row pitch
- 13.63m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Bilousove
The designer opens with this place’s coordinates, latitude 47.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 89 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 153 kWh/kWp, December: 34 — 4.5 times less.
January: 40 against 44 in the oblast, 9.1% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,075 | 765 | 170 |
| 10 | 12,149 | 1,530 | 340 |
| 15 | 18,224 | 2,295 | 510 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Karyerne2 km1,215 kWh/kWp
- Bila Krynytsya4 km1,215 kWh/kWp
- Velyka Oleksandrivka4 km1,214 kWh/kWp
- Pervomaiske5 km1,217 kWh/kWp
- Mala Oleksandrivka5 km1,214 kWh/kWp
- Tverdomedove5 km1,215 kWh/kWp
All places: Beryslavskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)