Solar plant: site data
Solar power plant in Tiahynka, Beryslavskyi Raion, Kherson Oblast
Tiahynka: 1,249 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,253). #5 of 151 in the rayon, #402 of 711 in the oblast.
Beryslav, the rayon centre, is 29 km away. 24 m above sea level. 23 km away: Nova Kakhovka, the nearest bigger centre, the same 1,246. Snow and wind from the nearest regional centre in the DBN — Херсон, 37 km. 9.65 m between rows, pitch 13.47 m (latitude 46.8°).
- Yield of 1 kWp
- 1,249kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 12,489kWh/year
- Row pitch
- 13.47m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Tiahynka
The designer opens with this place’s coordinates, latitude 46.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 37 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 153 kWh/kWp, December: 39 — 3.9 times less.
January: 50 against 44 in the oblast, 13.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,245 | 765 | 195 |
| 10 | 12,489 | 1,530 | 390 |
| 15 | 18,734 | 2,295 | 585 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Ivanivka5 km1,246 kWh/kWp
- Krynky6 km1,243 kWh/kWp
- Novotiahynka6 km1,246 kWh/kWp
- Lvove8 km1,247 kWh/kWp
- Tokarivka8 km1,246 kWh/kWp
- Kozachi Laheri10 km1,245 kWh/kWp
All places: Beryslavskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.