Solar power plant in Krynky, Khersonskyi Raion, Kherson Oblast

Krynky: 1,243 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.8% below the oblast median (1,253). #106 of 109 in the rayon, #462 of 711 in the oblast.

Kherson, the rayon centre, is 37 km away. 6 m above sea level. 21 km away: Nova Kakhovka, the nearest bigger centre, the same 1,246. Snow and wind from the nearest regional centre in the DBN — Херсон, 37 km. 9.62 m between rows, pitch 13.44 m (latitude 46.7°).

Yield of 1 kWp
1,243kWh/year
Tilt
37°2° east of south
10 kW
12,427kWh/year
Row pitch
13.44m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Krynky

The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 37 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan65Feb107Mar123Apr139May140Jun153Jul152Aug128Sep96Oct52Nov38Dec

July: 153 kWh/kWp, December: 38 — 4.0 times less.

January: 49 against 44 in the oblast, 11.4% more.

Krynky: plants, kWh
kWpA yearJulyDecember
56,214765190
1012,4271,530380
1518,6412,295570

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed