Solar plant: site data

Solar power plant in Shliakhove, Beryslavskyi Raion, Kherson Oblast

Shliakhove: 1,251 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,253). #3 of 151 in the rayon, #377 of 711 in the oblast.

Beryslav, the rayon centre, is 4 km away. 59 m above sea level. 4 km away: Beryslav, the nearest bigger centre, 1,230 — 1.7% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 66 km. 9.48 m between rows, pitch 13.35 m (latitude 46.9°).

Yield of 1 kWp
1,251kWh/year
Tilt
36°2° east of south
10 kW
12,512kWh/year
Row pitch
13.35m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Shliakhove

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 66 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan63Feb106Mar126Apr145May144Jun153Jul154Aug128Sep98Oct52Nov36Dec

August: 154 kWh/kWp, December: 36 — 4.3 times less.

November: 52 against 55 in the oblast, 5.5% less.

Shliakhove: plants, kWh
kWpA yearAugustDecember
56,256770180
1012,5121,540360
1518,7682,310540

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Beryslavskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.