Solar plant: site data
Solar power plant in Novoberyslav, Beryslavskyi Raion, Kherson Oblast
Novoberyslav: 1,244 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.7% below the oblast median (1,253). #12 of 151 in the rayon, #450 of 711 in the oblast.
Beryslav, the rayon centre, is 5 km away. 32 m above sea level. 5 km away: Beryslav, the nearest bigger centre, 1,230 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 71 km. 9.47 m between rows, pitch 13.34 m (latitude 46.9°).
- Yield of 1 kWp
- 1,244kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 12,442kWh/year
- Row pitch
- 13.34m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Novoberyslav
The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 71 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 154 kWh/kWp, December: 36 — 4.3 times less.
November: 52 against 55 in the oblast, 5.5% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,221 | 770 | 180 |
| 10 | 12,442 | 1,540 | 360 |
| 15 | 18,663 | 2,310 | 540 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Kakhovka5 km1,226 kWh/kWp
- Shliakhove5 km1,251 kWh/kWp
- Beryslav5 km1,230 kWh/kWp
- Zmiivka7 km1,240 kWh/kWp
- Lyubymivka8 km1,245 kWh/kWp
- Malokakhovka9 km1,256 kWh/kWp
All places: Beryslavskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.