Solar plant: site data

Solar power plant in Sadky, Henicheskyi Raion, Kherson Oblast

Sadky: 1,283 kWh per kWp a year, tilt 35° 3° west of south (PVGIS). 2.4% above the oblast median (1,253). #42 of 167 in the rayon, #169 of 711 in the oblast.

Henichesk, the rayon centre, is 21 km away. 15 m above sea level. 21 km away: Henichesk, the nearest bigger centre, 1,260 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 193 km. 8.81 m between rows, pitch 12.73 m (latitude 46.1°).

Yield of 1 kWp
1,283kWh/year
Tilt
35°3° west of south
10 kW
12,830kWh/year
Row pitch
12.73m · GCR 0.38
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Sadky

The designer opens with this place’s coordinates, latitude 46.1° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 193 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan61Feb101Mar131Apr152May151Jun162Jul161Aug133Sep93Oct52Nov41Dec

July: 162 kWh/kWp, December: 41 — 4.0 times less.

December: 41 against 37 in the oblast, 10.8% more.

Sadky: plants, kWh
kWpA yearJulyDecember
56,415810205
1012,8301,620410
1519,2452,430615

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.