Solar plant: site data
Solar power plant in Henichesk, Henicheskyi Raion, Kherson Oblast
Henichesk: 1,260 kWh per kWp a year, tilt 35° 1° west of south (PVGIS). 0.6% above the oblast median (1,253). #75 of 167 in the rayon, #278 of 711 in the oblast.
Henichesk is the rayon centre. 16 m above sea level. 60 km away: Dzhankoy, the nearest bigger centre, 1,273 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 177 km. 8.85 m between rows, pitch 12.77 m (latitude 46.2°).
- Yield of 1 kWp
- 1,260kWh/year
- Tilt
- 35°1° west of south
- 10 kW
- 12,603kWh/year
- Row pitch
- 12.77m · GCR 0.37
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Henichesk
The designer opens with this place’s coordinates, latitude 46.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 177 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 157 kWh/kWp, December: 40 — 3.9 times less.
December: 40 against 37 in the oblast, 8.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,302 | 785 | 200 |
| 10 | 12,603 | 1,570 | 400 |
| 15 | 18,905 | 2,355 | 600 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Semykhatka6 km1,289 kWh/kWp
- Prydorozhnye6 km1,276 kWh/kWp
- Henicheska Hirka8 km1,273 kWh/kWp
- Chervone10 km1,288 kWh/kWp
- Yaroshyk11 km1,298 kWh/kWp
- Pryozerne11 km1,277 kWh/kWp
All places: Henicheskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.