Solar plant: site data

Solar power plant in Yaroshyk, Henicheskyi Raion, Kherson Oblast

Yaroshyk: 1,298 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 3.6% above the oblast median (1,253). #8 of 167 in the rayon, #92 of 711 in the oblast.

Henichesk, the rayon centre, is 11 km away. 12 m above sea level. 11 km away: Henichesk, the nearest bigger centre, 1,260 — 3.0% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 167 km. 9.11 m between rows, pitch 12.98 m (latitude 46.2°).

Yield of 1 kWp
1,298kWh/year
Tilt
36°1° west of south
10 kW
12,978kWh/year
Row pitch
12.98m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Yaroshyk

The designer opens with this place’s coordinates, latitude 46.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 167 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan61Feb109Mar132Apr153May149Jun159Jul160Aug134Sep100Oct57Nov40Dec

August: 160 kWh/kWp, December: 40 — 4.0 times less.

December: 40 against 37 in the oblast, 8.1% more.

Yaroshyk: plants, kWh
kWpA yearAugustDecember
56,489800200
1012,9781,600400
1519,4672,400600

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.