Pidstepne: 1,256 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). Exactly the oblast median (1,253). #81 of 109 in the rayon, #321 of 711 in the oblast.

Kherson, the rayon centre, is 22 km away. 11 m above sea level. 14 km away: Oleshky, the nearest bigger centre, 1,264 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 21 km. 9.57 m between rows, pitch 13.39 m (latitude 46.7°).

Yield of 1 kWp
1,256kWh/year
Tilt
37°3° east of south
10 kW
12,561kWh/year
Row pitch
13.39m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Pidstepne

The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 21 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan66Feb108Mar126Apr140May141Jun153Jul153Aug129Sep98Oct54Nov40Dec

July: 153 kWh/kWp, December: 40 — 3.8 times less.

January: 49 against 44 in the oblast, 11.4% more.

Pidstepne: plants, kWh
kWpA yearJulyDecember
56,281765200
1012,5611,530400
1518,8422,295600

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khersonskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.