Solar plant: site data
Solar power plant in Kudasovo, Khersonskyi Raion, Kherson Oblast
Kudasovo: 1,250 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,253). #91 of 109 in the rayon, #393 of 711 in the oblast.
Kherson, the rayon centre, is 23 km away. 11 m above sea level. 15 km away: Oleshky, the nearest bigger centre, 1,264 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 22 km. 9.60 m between rows, pitch 13.42 m (latitude 46.7°).
- Yield of 1 kWp
- 1,250kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 12,498kWh/year
- Row pitch
- 13.42m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Kudasovo
The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 22 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 154 kWh/kWp, December: 39 — 3.9 times less.
January: 48 against 44 in the oblast, 9.1% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,249 | 770 | 195 |
| 10 | 12,498 | 1,540 | 390 |
| 15 | 18,747 | 2,310 | 585 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Pidstepne4 km1,256 kWh/kWp
- Poniativka6 km1,251 kWh/kWp
- Orlova6 km1,247 kWh/kWp
- Sadove6 km1,257 kWh/kWp
- Kozachi Laheri7 km1,245 kWh/kWp
- Pishchanivka7 km1,255 kWh/kWp
All places: Khersonskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.