Solar plant: site data

Solar power plant in Hromivka, Henicheskyi Raion, Kherson Oblast

Hromivka: 1,282 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.3% above the oblast median (1,253). #43 of 167 in the rayon, #172 of 711 in the oblast.

Henichesk, the rayon centre, is 57 km away. 8 m above sea level. 38 km away: Armyansk, the nearest bigger centre, 1,317 — 2.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 119 km. 9.15 m between rows, pitch 13.02 m (latitude 46.3°).

Yield of 1 kWp
1,282kWh/year
Tilt
36°1° east of south
10 kW
12,821kWh/year
Row pitch
13.02m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Hromivka

The designer opens with this place’s coordinates, latitude 46.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 119 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan62Feb109Mar129Apr148May144Jun155Jul155Aug131Sep102Oct58Nov41Dec

July: 155 kWh/kWp, December: 41 — 3.8 times less.

January: 49 against 44 in the oblast, 11.4% more.

Hromivka: plants, kWh
kWpA yearJulyDecember
56,411775205
1012,8211,550410
1519,2322,325615

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.