Solar power plant in Hordiienkivtsi, Henicheskyi Raion, Kherson Oblast

Hordiienkivtsi: 1,266 kWh per kWp a year, tilt 36° facing south (PVGIS). 1.0% above the oblast median (1,253). #68 of 167 in the rayon, #244 of 711 in the oblast.

Henichesk, the rayon centre, is 22 km away. 24 m above sea level. 22 km away: Henichesk, the nearest bigger centre, the same 1,260. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 166 km. 9.18 m between rows, pitch 13.05 m (latitude 46.4°).

Yield of 1 kWp
1,266kWh/year
Tilt
36°facing south
10 kW
12,661kWh/year
Row pitch
13.05m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Hordiienkivtsi

The designer opens with this place’s coordinates, latitude 46.4° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 166 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan61Feb107Mar128Apr149May146Jun154Jul155Aug131Sep98Oct56Nov38Dec

August: 155 kWh/kWp, December: 38 — 4.1 times less.

May: 149 against 144 in the oblast, 3.5% more.

Hordiienkivtsi: plants, kWh
kWpA yearAugustDecember
56,331775190
1012,6611,550380
1518,9922,325570

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.