Solar plant: site data

Solar power plant in Haiove, Henicheskyi Raion, Kherson Oblast

Haiove: 1,271 kWh per kWp a year, tilt 36° facing south (PVGIS). 1.4% above the oblast median (1,253). #62 of 167 in the rayon, #223 of 711 in the oblast.

Henichesk, the rayon centre, is 18 km away. 19 m above sea level. 18 km away: Henichesk, the nearest bigger centre, 1,260 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 170 km. 9.16 m between rows, pitch 13.03 m (latitude 46.3°).

Yield of 1 kWp
1,271kWh/year
Tilt
36°facing south
10 kW
12,706kWh/year
Row pitch
13.03m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Haiove

The designer opens with this place’s coordinates, latitude 46.3° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 170 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

43Jan61Feb107Mar129Apr149May146Jun155Jul156Aug132Sep98Oct56Nov38Dec

August: 156 kWh/kWp, December: 38 — 4.1 times less.

May: 149 against 144 in the oblast, 3.5% more.

Haiove: plants, kWh
kWpA yearAugustDecember
56,353780190
1012,7061,560380
1519,0592,340570

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.