Solar plant: site data

Solar power plant in Heroyske, Skadovskyi Raion, Kherson Oblast

Heroyske: 1,310 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 4.5% above the oblast median (1,253). #41 of 114 in the rayon, #43 of 711 in the oblast.

Skadovsk, the rayon centre, is 90 km away. 2 m above sea level. 44 km away: Bilozerka, the nearest bigger centre, 1,286 — 1.9% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 51 km. 9.27 m between rows, pitch 13.14 m (latitude 46.5°).

Yield of 1 kWp
1,310kWh/year
Tilt
36°2° west of south
10 kW
13,097kWh/year
Row pitch
13.14m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Heroyske

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 51 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan67Feb110Mar135Apr151May149Jun162Jul160Aug133Sep102Oct54Nov41Dec

July: 162 kWh/kWp, December: 41 — 4.0 times less.

February: 67 against 60 in the oblast, 11.7% more.

Heroyske: plants, kWh
kWpA yearJulyDecember
56,549810205
1013,0971,620410
1519,6462,430615

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Skadovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.