Solar plant: site data
Solar power plant in Travneve, Berestynskyi Raion, Kharkiv Oblast
Travneve: 1,148 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,142). #130 of 208 in the rayon, #520 of 1769 in the oblast.
Berestyn, the rayon centre, is 27 km away. 125 m above sea level. 27 km away: Berestyn, the nearest bigger centre, 1,158 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 80 km. 11.06 m between rows, pitch 14.93 m (latitude 49.1°).
- Yield of 1 kWp
- 1,148kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,475kWh/year
- Row pitch
- 14.93m · GCR 0.32
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,340 / 470Pa
Ground frame designer
A ground frame for a solar plant: Travneve
The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 80 km: snow 1,340 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 149 kWh/kWp, December: 26 — 5.7 times less.
February: 52 against 57 in the oblast, 8.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,738 | 745 | 130 |
| 10 | 11,475 | 1,490 | 260 |
| 15 | 17,213 | 2,235 | 390 |
Example: a 10 kW ground frame
For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Molodizhne3 km1,147 kWh/kWp
- Berdianka4 km1,150 kWh/kWp
- Zabaryne4 km1,148 kWh/kWp
- Vyshneve6 km1,151 kWh/kWp
- Kopanky7 km1,147 kWh/kWp
- Oleksandrivka7 km1,151 kWh/kWp
All places: Berestynskyi RaionKharkiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.